Stop relying on fragmented PDFs and tribal knowledge for shutdown planning.

Trusted by Canadian hospitals managing patient-critical infrastructure.
Capital projects fail quietly when teams think they understand dependencies — until a shutdown exposes what wasn't documented.
A breaker trip in a mechanical room shouldn't be the way you find out the ER is on that circuit. Shutdowns without traceability are career risks.
Stop paying for the same site survey on every capital phase. When your data isn't governed, it's trapped in a PDF and lost on turnover.
Projects stall for weeks because nobody is willing to sign off on a shutdown they don't fully understand. Uncertainty is the primary driver of delay.
It can take weeks or months to investigate before we can actually do something.
— VP, Facilities & Capital Development
Major Canadian Academic Health Centre
Equipment, sources, and clinical services actually connected.
Every data point linked to a field-captured photo of the actual asset.
Approved changes and audit trails preserve the master model over time.
Weeks spent digging through legacy drawings to guess at dependencies before every project.
Every capital project adds another disconnected PDF to a pile that nobody trusts.
Critical system intelligence disappears when key facility personnel or consultants retire.
Click a panel; see every downstream clinical service and stakeholder impacted in seconds.
Every project updates the master model. Your "as-built reality" is always current and governed.
The platform persists across leadership changes, capturing and preserving field-verified reality.
PMs report major time savings by eliminating weeks of rediscovery across fragmented drawings, PDFs, and legacy documentation when preparing capital work and shutdowns.
PowerTree provides validated system models, photographic evidence, and export-ready data — reducing re-surveying by engineers in live hospital environments.
Healthcare PMs strongly recommend PowerTree to peer organizations.
Establish your governed technical baseline today and remove the risk from your next shutdown



